We have been blessed, amazingly, with some fine weather this week; this helps enormously with the further consolidation of the secondary timbers to the Dance Studio roof in anticipation of its covering. Discussions continue on the cladding and selection of the installer. The frames for the walls to the Dance Studio are going in; there will be two windows along with a skylight. First fixes are being made for the electrics and comms required for the lighting and sound equipment to be installed. There will be a patch bay into which for eg a dance tutor can easily plug in their iPhone to play music. Boogie Babies will be able to use the Studio as there will be lighting and projection available, as now, but with the added bonus of underfloor heating. The timber frame for the Art Studio will arrive from 14 October.
Holyhead – A Cultural and Heritage driven transformation funded by the UK Government with match funding from the Arts Council of Wales and the Community Facilities Programme.